THE HOMEOWNER’S PANEL DECISION GUIDE

Electrical Panel Upgrade Guide for Las Vegas Homeowners

Considering an electrical panel replacement or 200-amp service upgrade in Las Vegas or Henderson? Understand whether replacement is needed, how breaker space differs from electrical capacity, whether a subpanel or tandem breakers may work, and what affects the final price.

USE THE CORRECT TERMS

Electrical Panel Replacement vs. Service Upgrade

Replacing a panel and increasing electrical-service capacity are different projects. A new panel may retain the existing service rating. A service upgrade increases the electrical capacity available to the property.

Panel Replacement

Installs a new panel while potentially retaining the existing service rating.

What It Addresses

  • Damaged or deteriorated panel equipment.
  • Obsolete equipment or failed components.
  • Insufficient physical breaker spaces.
  • A panel configuration unsuitable for planned equipment.

Capacity Limitation

  • Panel replacement does not automatically increase service capacity.
  • Breaker space and available electrical capacity must be evaluated separately.

Service Upgrade

Increases electrical capacity, such as changing from 125 amps to 200 amps.

When It May Be Needed

  • Existing service lacks capacity for current or planned loads.
  • A load evaluation supports increasing the service rating.
  • Other reasonable alternatives cannot accommodate the additional demand.

Additional Work

  • May require changes to meter equipment and service conductors.
  • May involve grounding corrections, permits and inspections.
  • Requires evaluation of utility requirements and coordination.

DO NOT CONFUSE THESE

Breaker Space Is Not Electrical-Service Capacity

Breaker spaces are physical positions inside the panel. Service ampacity is the electrical capacity available to the property. A panel can be full but still have enough capacity. It can also have open breaker spaces but insufficient capacity for another large electrical load.

Not Enough Breaker Space

The panel has no available positions for additional circuits, but the existing electrical service may still have enough capacity.

Options to Evaluate

  • Listed tandem or quad breakers where the panel permits them.
  • Reorganization of the existing breakers and circuits.
  • A larger panel that retains the existing service amperage.
  • A subpanel that provides additional circuit positions.

What a Subpanel Does

A subpanel creates additional breaker spaces. It does not increase the capacity of the utility service.

Not Enough Electrical Capacity

Existing and planned electrical loads may exceed what the current service can support, even when the panel has empty breaker spaces.

Options to Evaluate

  • A service upgrade supported by an electrical-load evaluation.
  • Load-management equipment that controls when equipment operates.
  • Equipment with adjustable or lower electrical demand.
  • Other suitable alternatives before committing to replacement.

What Empty Spaces Do Not Prove

An unused breaker position does not confirm that the service has enough capacity for an EV charger, spa, electric HVAC system or other large load.

Ask for a Load Calculation

Do not base an upgrade solely on house size, panel age, one month's electric bill, the number of breakers or EV ownership. The evaluation should consider HVAC, cooking, water heating, dryers, EV charging, pools, spas, accessory structures and other existing or planned loads.

Monthly energy use and simultaneous electrical demand are different measurements. Your electric bill alone does not establish how much additional equipment the service can support.

An EV charger does not automatically require a panel upgrade. A service upgrade becomes one possible solution when the existing service lacks sufficient capacity and other reasonable alternatives are unsuitable.

UNDERSTANDING THE ESTIMATE

What Determines Electrical Panel Replacement Cost?

The panel itself is only one part of the price. Access, utility service, grounding, wall construction and inspection requirements can change labor and materials substantially.

Every Panel Estimate Requires an On-Site Evaluation

Panel work cannot be priced accurately from photographs alone. PDQ examines the complete installation before providing repair, replacement or service-upgrade options.

Panel Location

Indoor, outdoor, garage, closet, finished wall and working access all affect the installation.

Overhead or Underground Service

Service mast, attachment height, utility conductors, underground conduit and trenching can change the scope.

Wall Opening

A larger enclosure may require cutting drywall, stucco or siding and modifying framing or finish work.

Blocked Clearance

Built-in cabinets, shelving, decorative enclosures, storage, appliances or landscaping can make the existing location unsuitable.

Grounding and Bonding

Ground rods, water-pipe bonding and grounding-electrode conductors may need correction as part of permitted work.

Attic or Crawl Access

Limited access, insulation, long conductor routes and extreme attic heat increase installation time.

Existing Equipment

Meter-main configuration, conductors, raceways, mast condition and damaged equipment affect replacement options.

Permits and Inspection

Plans, permit processing, field inspection and required corrections affect the schedule and final scope.

Utility Coordination

Disconnect, reconnect, meter work and utility-owned infrastructure cannot be controlled solely by the electrician.

PDQ is your one-stop shop for panel replacement and stucco repair. We handle the electrical panel work and repair the stucco affected by the installation. Your written estimate will specify the included stucco repairs and any other finish work.

BEFORE REPLACING THE PANEL

What Are the Alternatives to a Full Panel Upgrade?

A full panel does not necessarily mean the home needs more utility capacity. Before recommending replacement, PDQ can evaluate the existing equipment, available capacity and planned electrical loads.

  1. Reorganize Existing Breakers

    Circuits can sometimes be rearranged to create adjacent spaces for new two-pole equipment.

  2. Use Listed Tandem or Quad Breakers

    These may create physical space only when the panel is specifically designed and listed for them.

  3. Install a Subpanel

    A subpanel adds breaker positions but does not increase total utility-service ampacity.

  4. Use Load Management

    Controls can prevent major loads from operating simultaneously and may avoid a service upgrade.

  5. Lower EV Charging Amperage

    Adjustable charging or smart load management may fit available capacity while still providing practical overnight charging.

  6. Repair Existing Equipment

    A replaceable breaker or limited connection problem may not justify replacing serviceable equipment.

Circuits cannot simply be combined under one breaker to make room. Any consolidation must maintain proper circuit protection and use equipment listed for the panel.

PERMITS, INSPECTION AND UTILITY COORDINATION

Planning a Permitted Electrical Panel Replacement

Panel replacement involves more than installing a new breaker box. The scope, equipment, applicable permit process, inspection and any required NV Energy disconnect and reconnect must be coordinated.

PDQ evaluates the property first, then explains the required work and coordination before installation is scheduled.

What Should the Written Quote Identify?

  • The panel equipment and electrical-service rating.
  • Permit and inspection coordination.
  • Any required NV Energy disconnect and reconnect.
  • Utility fees and who pays them.
  • Grounding, bonding and other required corrections.
  • Expected power outage and scheduling limitations.
  • Included stucco repairs and other finish work.

Typical Planning and Installation Process

  1. On-Site Evaluation

    PDQ examines the panel, meter, grounding, utility service, access and planned electrical loads.

  2. Finalize the Scope and Permit Process

    The work is defined, equipment is selected and the applicable permit process begins.

  3. Coordinate with NV Energy

    When utility de-energization is required, PDQ coordinates the temporary disconnect and reconnect appointment. Utility scheduling can affect the installation date.

  4. Complete the Approved Panel Work

    PDQ installs the equipment and completes the approved conductor, grounding and related electrical work.

  5. Inspection, Reconnection and Testing

    The required inspection or meter-release process is completed, utility reconnection is coordinated, and PDQ tests and labels the installation.

Physical installation time is not the entire project schedule. Panel work may occur in one working day, but permitting and utility coordination begin beforehand. Same-day reconnection is the goal and cannot be guaranteed.

CHOOSE THE EQUIPMENT

Which Electrical Panel Should Be Installed?

Compare the actual equipment included in the proposal. Manufacturer, breaker availability, physical spaces, service rating and future electrical needs all matter when selecting a replacement panel.

Conventional Panel

Ask about manufacturer, breaker availability, indoor or outdoor rating, spaces, tandem eligibility, bus rating, main-breaker rating and warranty.

Smart Panel

May provide monitoring, load management, EV integration and backup prioritization, but costs more and can depend on proprietary hardware, software or subscriptions.

Whole-Home Surge Protection

Panel work can be an efficient time to add listed surge protection. It reduces risk from certain transient voltage events but does not protect against every event.

Breaker Spaces and Service Rating

Confirm the number of usable breaker positions and the electrical-service rating separately. A larger enclosure or additional breaker spaces does not automatically increase service capacity.

Future Equipment Compatibility

Discuss planned EV charging, solar, battery storage or generator equipment before choosing the panel. These projects can affect the appropriate equipment and configuration.

Get the equipment details in writing. Compare the panel model, spaces, main breaker, branch breakers, included accessories and warranties when reviewing quotes.

Understand What Changes

A New Panel Will Not Lower Your Electric Bill

A larger panel allows the home to support more electrical demand. It does not force the home to use more electricity, make existing appliances more efficient or create an energy-savings payback. Its value comes from safety, capacity, serviceability and future flexibility.

What Panel Work Can Address

  • Damaged or deteriorated panel equipment.
  • Insufficient breaker space.
  • Insufficient service capacity, when a service upgrade is justified by the evaluation.
  • Equipment compatibility and room for planned electrical additions.

What a Panel Change Will Not Automatically Fix

  • Old wiring or aluminum branch circuits.
  • Ungrounded outlets or damaged wiring elsewhere.
  • Overloaded individual circuits or defective appliances.
  • Utility voltage problems.
  • Improper DIY work outside the panel.

Know what your estimate covers: Panel replacement and repairs elsewhere in the home are separate scopes of work. Ask which problems the proposed work will address and which require additional evaluation or repairs.

Residential Service Sizes

How Much Electrical Capacity Does a Home Need?

The right service size depends on the home's existing electrical loads and future plans. A smaller service is not automatically inadequate, and a larger service does not provide unlimited capacity.

100–125A

May suit smaller or lower-demand homes. It is not automatically inadequate merely because it is older.

150A

Can be adequate for many homes depending on HVAC, fuel types, appliances and future plans.

200A

A common modern service size with flexibility for many homes, but not unlimited capacity.

400A Class

May fit very large or unusually high-demand residences after a load calculation and utility review.

Why Replace an Existing 200-Amp Panel?

  • Burned or damaged bus.
  • Corrosion or water intrusion.
  • Failed main breaker.
  • Obsolete components.
  • Improper modifications.
  • Insufficient physical breaker spaces.
  • Damaged enclosure.
  • Solar, battery or generator configuration.

A 200-amp panel can be replaced while retaining 200-amp service.

When Might a Home Need 400-Amp-Class Service?

  • Very large residence.
  • Multiple HVAC systems.
  • Multiple EV chargers.
  • Large pool and spa equipment.
  • All-electric appliances.
  • Detached shop or casita.
  • High simultaneous electrical demand.

These loads should be evaluated together before choosing a service size.

Understand the proposed configuration: Some residential “400-amp” configurations use 320-amp continuous-rated metering and multiple distribution panels. Ask what equipment and service arrangement your estimate includes.

Identify Your Existing Equipment

Older, Obsolete and Insurance-Flagged Panels

Do not label every older electrical panel automatically dangerous. Identify the exact manufacturer, model, product line, recall status and physical condition before deciding whether replacement is needed.

Federal Pacific / FPE / Stab-Lok

Look for Federal Pacific, FPE or Stab-Lok markings. These names help identify the equipment for further evaluation. Confirm the actual panel and breaker product line rather than relying only on the home's age.

Zinsco / GTE Sylvania

Look for Zinsco, GTE Sylvania or Sylvania markings and narrow breakers that may have colored handles. The exact product line and equipment condition should be evaluated before choosing a repair or replacement scope.

Bulldog Pushmatic

Often labeled Bulldog Electric or Pushmatic, this equipment uses push-button breakers rather than standard toggle handles. Identify the installed components and evaluate their condition and serviceability.

Older Fuse Equipment

Screw-in plug fuses are not automatically unsafe. The evaluation should consider overfusing, modifications, service capacity and wiring condition.

Model-Specific Recalls

Some recalls affect only particular models, date codes or components. Match the installed equipment to the actual recall information instead of assuming every panel from the same manufacturer is affected.

If your insurance company requests replacement: Ask for the exact equipment concern and written requirements. The panel model, physical condition and requested scope should be clear before you approve the work.

Solar and Battery Storage

How Solar Installation Can Affect the Electrical Panel

Every solar project requires an interconnection review. Many require electrical modification at or near the panel, but solar installation does not automatically mean the service ampacity must increase.

Common Solar Connection

Conductors from an inverter or combiner may terminate through a disconnect and a two-pole solar breaker. The breaker can consume two positions and may be relatively large depending on inverter output.

Possible Panel Limitations

No adjacent breaker spaces, unavailable breakers, bus limitations, main-breaker configuration, obsolete equipment or existing solar can change the interconnection method.

Alternatives to Panel Replacement

Possible solutions include breaker reorganization, a solar-combiner panel, a subpanel, a power-control system, adjusted inverter output or an approved supply-side connection. Panel replacement is another option when appropriate.

Adding Battery Backup

A backup gateway, transfer equipment, critical-loads panel, service disconnect and load management can make a solar-plus-storage installation substantially more involved. Discuss backup plans before selecting the panel equipment.

Solar interconnection capacity is not the same as household load capacity. A solar project can require panel modification even when the home has adequate service ampacity. Conversely, a 200-amp panel does not automatically accept every solar system.

Who Performs the Panel Work?

Solar Companies and Electrical Subcontractors

Many solar companies include a panel change in the solar package but subcontract the electrical work. Subcontracting is common and does not automatically mean poor work. Risk increases when price and speed receive more attention than equipment selection, supervision and long-term serviceability.

Questions for the Solar Company

  • Who will perform the panel work?
  • What is the contractor's license number?
  • Who warranties the workmanship?
  • Why is panel replacement necessary?
  • What alternatives were evaluated?
  • Who handles future panel problems?
  • Is the panel work included in the solar permit?

Consider an Independent Electrical Contractor

Depending on the agreement and project coordination, you may be able to have a separate electrical contractor evaluate and complete the panel work before solar installation. This provides direct responsibility, equipment choice and an independent opinion on whether replacement is necessary.

PDQ has encountered solar installations with incorrectly sized disconnect fuses, incorrectly sized panel breakers or mismatched overcurrent-protection components. An oversized fuse or breaker can compromise the protection intended for conductors and equipment. An undersized device can cause nuisance trips, lost production and repeated service calls.

If Protection Is Too Large

  • Conductors may overheat.
  • Insulation can be damaged.
  • Terminations can deteriorate.
  • Arcing or panel damage may occur.
  • Warranty and inspection problems can result.

If Protection Is Too Small

  • Nuisance trips.
  • Unnecessary production shutdowns.
  • Lost energy production.
  • Repeated resetting.
  • Troubleshooting expense.

A breaker that physically fits is not necessarily correct. Correct selection considers inverter output, continuous current, conductor ampacity, disconnect rating, panel rating, manufacturer instructions and approved plans.

Built for Southern Nevada

Does the Time of Year Affect Panel Replacement Cost?

Las Vegas summer conditions can make exterior and attic work slower. Crews require heat-recovery and hydration breaks, attics become more difficult to work in, and the home may lose air conditioning during the power outage.

Optional Projects That May Be Scheduled

  • A future oven circuit.
  • A planned EV charger.
  • A future remodel.
  • Additional breaker space.
  • Electrification that is not yet needed.

Do Not Delay Active Hazards

  • Burning or arcing.
  • Severe corrosion.
  • Water intrusion.
  • Active overheating.
  • Damaged service equipment.

If the project is optional, consider cooler months. Cooler conditions can reduce installation difficulty and labor time, which may reduce the overall installation cost. Discuss timing during your on-site evaluation.

Scheduling and Installation Day

How Long Does Electrical Panel Replacement Take?

The physical installation may occur in one working day, but permitting and utility coordination begin before installation day and can control the overall schedule.

Before Installation Day

  1. On-site evaluation: PDQ examines the panel, meter, grounding, utility service, access and planned electrical loads.
  2. Permit and equipment: The scope is finalized, equipment is selected and the applicable permit process begins.
  3. NV Energy appointment: When utility de-energization is required, PDQ coordinates the temporary disconnect and reconnect date.

Allow Time for Advance Scheduling

In PDQ's experience, a planned NV Energy temporary disconnect/reconnect appointment is often scheduled approximately one to two weeks in advance. This reflects typical experience and is not a guaranteed utility timeline.

Confirm the applicable utility fee and payment procedure when scheduling. The customer pays the utility fee directly through the NV Energy account; PDQ does not mark it up.

What Happens While the Power Is Off?

  1. PDQ arrives and prepares the site.
  2. NV Energy disconnects the service.
  3. PDQ begins the approved panel work.
  4. New equipment, conductors and grounding are installed as required by the scope.
  5. The required inspection or meter-release process is completed.
  6. NV Energy returns to reconnect service.
  7. PDQ tests and labels the installation.

How Long Will the Home Be Without Power?

Expect to be without power for the morning and afternoon, potentially into late afternoon or evening. PDQ works urgently between the utility disconnect and planned reconnection.

Same-day reconnection is the goal, not a guarantee. PDQ has experienced cases where NV Energy could not return until the following day. Inspection delays, unexpected corrections, utility workload or field conditions can also delay reconnection.

Prepare for the possibility of an overnight outage. Plan for air conditioning, refrigeration, medical equipment, internet, security systems, garage doors, gates, pool equipment, pets and vulnerable residents. In summer, have a safe alternative location available.

Understand the Complete Scope

Utility Requirements and Additional Electrical Corrections

A panel replacement can involve more than the panel itself. Existing utility infrastructure and conditions at the property can affect the approved scope, cost and schedule.

Utility-Side Limitations

  • Existing utility conductors and transformer capacity.
  • Meter requirements.
  • Overhead service attachment.
  • Underground service lateral.
  • Easements and trenching.
  • Utility engineering and scheduling.

The electrician cannot guarantee utility-owned infrastructure or utility scheduling. These requirements should be reviewed before committing to a service upgrade.

Will Other Corrections Be Required?

  • Grounding and bonding.
  • Service disconnects and working clearance.
  • Incompatible breakers.
  • Damaged raceways.
  • Service mast corrections.
  • Weatherproofing and labeling.
  • Required inspection corrections.

Permitted work may require corrections related to the installation. Replacing a panel does not necessarily require rewiring the entire home.

PDQ is your one-stop shop for panel replacement and stucco repair. We handle the electrical panel work and repair the stucco affected by the installation. Your written estimate will specify the included stucco repairs and any other finish work.

Understand the Complete Scope

Utility Requirements and Additional Electrical Corrections

A panel replacement can involve more than the panel itself. Existing utility infrastructure and conditions at the property can affect the approved scope, cost and schedule.

Utility-Side Limitations

  • Existing utility conductors and transformer capacity.
  • Meter requirements.
  • Overhead service attachment.
  • Underground service lateral.
  • Easements and trenching.
  • Utility engineering and scheduling.

The electrician cannot guarantee utility-owned infrastructure or utility scheduling. These requirements should be reviewed before committing to a service upgrade.

Will Other Corrections Be Required?

  • Grounding and bonding.
  • Service disconnects and working clearance.
  • Incompatible breakers.
  • Damaged raceways.
  • Service mast corrections.
  • Weatherproofing and labeling.
  • Required inspection corrections.

Permitted work may require corrections related to the installation. Replacing a panel does not necessarily require rewiring the entire home.

PDQ is your one-stop shop for panel replacement and stucco repair. We handle the electrical panel work and repair the stucco affected by the installation. Your written estimate will specify the included stucco repairs and any other finish work.

Pricing Can Vary Considerably

Get Multiple Written Quotes for Panel Replacement

Panel-change pricing can vary substantially between installers. Obtain multiple written quotes and consider PDQ Electric as one of the companies providing a quote. Compare the actual equipment, complete scope, exclusions, scheduling, utility process and warranty.

Electrical Scope

  • Service rating.
  • Panel manufacturer, model and breaker spaces.
  • Main breaker and branch breakers.
  • Meter equipment.
  • Service conductors.
  • Grounding and bonding.

Coordination and Fees

  • Permit.
  • Inspection.
  • NV Energy coordination.
  • Utility fee and who pays it.
  • Handling of required corrections.
  • Expected power outage and scheduling.

Property and Warranty

  • Included drywall and stucco repairs.
  • Cabinet removal, if required.
  • Painting and other finish work.
  • Cleanup.
  • Manufacturer warranty.
  • Workmanship warranty.

PDQ does not expect homeowners to make a major decision from one estimate. Compare what each proposal includes and excludes before comparing the final price. PDQ handles panel replacement and the stucco repairs specified in your written estimate.

Protect the Investment

Keep Your Panel Replacement Documentation

Keep the proposal, installation records and warranty information together so you can refer to the approved scope, installed equipment and completed inspections.

Project and Inspection Records

  • Signed proposal.
  • Permit and approved plans.
  • Final inspection record.
  • Utility authorization.
  • Panel manufacturer and model information.
  • Breaker directory.

Photos, Warranties and Payments

  • Before-and-after photographs.
  • Contractor information.
  • Equipment warranty.
  • Workmanship warranty.
  • Solar and battery records, when applicable.
  • Records of paid utility charges.

Documentation helps explain the completed work. A permitted, documented installation may be easier to explain to insurers, inspectors and future buyers, but panel replacement does not guarantee lower insurance premiums or increased resale value.

Pause Before Signing

When Should You Get a Second Opinion?

Before approving a panel replacement or service upgrade, understand the identified problem, the proposed solution and the alternatives that were evaluated.

Reasons to Ask for Another Evaluation

  • Replacement is recommended without identifying the problem.
  • No one separates breaker space from service ampacity.
  • Every EV charger is claimed to require 200-amp service.
  • A solar company cannot explain the interconnection limitation.
  • The proposed equipment is unidentified.
  • Major exclusions are unclear.
  • The recommendation is based only on panel age.
  • You are pressured to sign immediately.

When You May Not Need Replacement

  • The concern is cosmetic.
  • A listed breaker option or subpanel solves the space problem.
  • The service has adequate ampacity.
  • The fault is elsewhere in the electrical system.
  • No one can identify a defect.
  • Future electrical loads are speculative.
  • Load management has not been evaluated.

Ask what makes replacement necessary. PDQ can evaluate the existing equipment, explain the identified problem and discuss reasonable alternatives so you can compare the proposed work before making a decision.

PDQ's Approach

Every Panel Estimate Requires an On-Site Evaluation

Panel work cannot be priced accurately from photographs alone. PDQ examines the complete installation before providing repair, replacement or service-upgrade options.

Electrical Equipment

Manufacturer, condition, main breaker, bus rating, breaker spaces, meter equipment and service conductors.

Property Conditions

Overhead or underground service, grounding, working clearance, wall opening, attic route and access.

Current and Future Needs

Existing electrical loads, planned equipment, solar, battery storage, EV charging and available alternatives to a full panel replacement or service upgrade.

Frequently Asked Questions

Electrical Panel Upgrade FAQ

Does a full electrical panel require replacement?
No. Breaker reorganization, listed tandem or quad breakers, a larger same-amperage panel or a subpanel may solve a space problem. Available service ampacity must be evaluated separately.
Does an EV charger require 200-amp service?
Not automatically. Charger amperage, existing loads, service capacity, breaker space and load-management options must be evaluated.
Does solar require panel replacement?
Not always. Solar requires an approved interconnection, but the solution may involve a breaker, combiner panel, power-control system, approved supply-side connection or another method rather than panel replacement.
Is a 125- or 150-amp service inadequate?
Not necessarily. Suitability depends on the home's calculated demand, fuel types, appliances and planned electrical loads.
Why replace an existing 200-amp panel?
Reasons can include damage, corrosion, failed components, obsolete equipment, insufficient physical breaker spaces, improper modifications or a configuration unsuitable for planned solar, batteries or generators. Replacement can retain the existing 200-amp service rating.
How long does a panel change take?
Physical work may be completed in one working day, but permitting and utility scheduling occur beforehand. Same-day reconnection is the goal but cannot be guaranteed.
How long will my power be off?
Plan to be without power throughout the morning and afternoon, potentially into late afternoon or evening. In some cases, utility reconnection may not occur until the following day. Prepare for the possibility of an overnight outage.
Who pays the NV Energy disconnect and reconnect fee?
The customer pays the applicable utility fee directly through the NV Energy account. PDQ does not mark it up. Confirm the current fee and payment procedure when scheduling.
Does summer affect the installation price?
It can. Extreme heat, attic conditions and required recovery breaks can increase labor time. If the project is optional, cooler conditions may reduce installation difficulty, labor time and overall cost.
Should I get more than one panel quote?
Yes. Panel pricing and included scope can vary considerably. Obtain multiple written quotes and consider PDQ as one of them. Compare equipment, utility coordination, property repairs, exclusions and warranties.
Does PDQ repair stucco affected by panel replacement?
Yes. PDQ is your one-stop shop for panel replacement and stucco repair. Your written estimate will specify the included stucco repairs and any other finish work.

FREE ON-SITE PANEL ESTIMATE

Understand Your Panel Options Before You Decide

PDQ will evaluate your electrical panel, service capacity and planned loads, then explain whether repair, replacement or a service upgrade is appropriate. Call, text photos or email to schedule your free on-site estimate.

Call PDQ

702-382-1100

Text Photos

702-600-1749